Showing posts with label cluster. Show all posts
Showing posts with label cluster. Show all posts

Wednesday, March 28, 2012

linkedServer fails from client when logged-in with NT-auth sql2k c

delegation on linked server fails in our network when we use nt-authenticate
d
logins. we have sql server 2000 nodes n1,n2 on win 2003 cluster. linked
server from n1 to n2 and n2 to n1 stop working when used in a query from
clinet xp pc.
we can query individually the servers(nodes/instances) from client and from
server nodes to server instances without any error.
the error we get is " msg xxx err xx Reason: login failed for user (NULL)
....."
Any thots,hints,links,pointers appreciated
Thanks,
GAGA,
If you are using the setting where the current login on server A is supposed
to pass through to server B and if one of the servers is not properly set up
for Kerberos delegation, you will have a problem.
RLF
"DallasBlue" <DallasBlue@.discussions.microsoft.com> wrote in message
news:7405A4DD-F0A5-478F-8569-6CC3F9BE120B@.microsoft.com...
> delegation on linked server fails in our network when we use
> nt-authenticated
> logins. we have sql server 2000 nodes n1,n2 on win 2003 cluster. linked
> server from n1 to n2 and n2 to n1 stop working when used in a query from
> clinet xp pc.
> we can query individually the servers(nodes/instances) from client and
> from
> server nodes to server instances without any error.
> the error we get is " msg xxx err xx Reason: login failed for user (NULL)
> ....."
> Any thots,hints,links,pointers appreciated
> Thanks,
> GA
>

Wednesday, March 21, 2012

servers Fail

I have a Windows 2000 active/passive cluster. I have configured 6 linked servers using OpenLink Database Proxy Client.

I have had to repeatedly cycle the cluster (stop/restart SQL services) because the linked servers "fail". By failing, I mean that the linked servers stop responding to user queries. The user query simply spins with no activity.

The linked servers are configured in the following manner:
1. I configure a DSN using the OpenLink client
2. I configure SQL Server linked server to point to the DSN

Each node in the cluster has identical DSN entries (same name, same driver, same settings). We have tested failing the cluster from Node 1 to Node 2 and back again. We have tested the failover process with queries actively running (they fail). We are always able to reconnect and resume normal processing after the backup node recovers the SQL server.

The linked server failures don't appear to have any real pattern to them. There seems to be a weak correlation between a failover and failure in the linked servers (the linked servers fail 1 - 2 days later).

This is not making any sense to me at all. I am NOT a fan of linked servers, but I have no choice here: I inherited these and the developers are NOT interested in alternative solutions.

If you have any thoughts on the matter, please drop a line.

Regards,

hmscott

Additonal info:
Windows 2000 SP4
SQL 2000 SP3 (hotfix 0818)
MDAC 2.7 SP1
OpenLink MultiTier 5.1Contacted MS PSS for answer. Did a stack dump and traced error to a modal messagebox that the client provider raised (!!!).

Back to the provider.

Was not related to cluster server, but it sure "felt" that way. Learned some great things about stack dumps and such.

Regards,

hmscott

servers Fail

I have a Windows 2000 active/passive cluster. I have
configured 6 linked servers using OpenLink Database Proxy
Client. See below for steps I took to create linked
server entries.
In two months of testing, I have had to cycle the SQL
cluster (stop/restart SQL services) three or four times
because the linked servers "fail". By failing, I mean that
the linked servers stop responding to user queries. The
user query simply spins with no activity. I have isolated
the failure to the interaction between SQL and the DSN
entry (ie, the DB proxy works, the DSN works, but SELECT *
FROM OPENQUERY(MyLink, 'SELECT * FROM db2Table.db2Column')
does not work).
The linked servers are configured in the following manner:
1. I configure a DSN using the OpenLink client
(www.openlinksw.com)
2. I configure SQL Server linked server to point to the DSN
Each node in the cluster has identical DSN entries (same
name, same driver, same settings). We have tested failing
the cluster from Node 1 to Node 2 and back again. We have
tested the failover process with queries actively running
(they fail). We are always able to reconnect and resume
normal processing after the backup node recovers the SQL
server.
The linked server failures don't appear to have any real
pattern to them. There seems to be a weak correlation
between a failover and failure in the linked servers (the
linked servers fail 1 - 2 days later).
This is not making any sense to me at all. I am NOT a fan
of linked servers, but I have no choice here: I inherited
these and the developers are NOT interested in alternative
solutions.
If you have any thoughts on the matter, please drop a line.
Regards,
hmscott
Additonal info:
Windows 2000 SP4
SQL 2000 SP3 (hotfix 0818)
MDAC 2.7 SP1
OpenLink MultiTier 5.1Contact MS PSS for answer. Did a stack dump and traced
error to a modal messagebox that the client provider
raised (!!!).
Back to the provider.
Regards,
hmscott
>--Original Message--
>I have a Windows 2000 active/passive cluster. I have
>configured 6 linked servers using OpenLink Database Proxy
>Client. See below for steps I took to create linked
>server entries.
>In two months of testing, I have had to cycle the SQL
>cluster (stop/restart SQL services) three or four times
>because the linked servers "fail". By failing, I mean
that
>the linked servers stop responding to user queries. The
>user query simply spins with no activity. I have
isolated
>the failure to the interaction between SQL and the DSN
>entry (ie, the DB proxy works, the DSN works, but SELECT
*
>FROM OPENQUERY(MyLink, 'SELECT * FROM
db2Table.db2Column')
>does not work).
>The linked servers are configured in the following manner:
>1. I configure a DSN using the OpenLink client
>(www.openlinksw.com)
>2. I configure SQL Server linked server to point to the
DSN
>Each node in the cluster has identical DSN entries (same
>name, same driver, same settings). We have tested failing
>the cluster from Node 1 to Node 2 and back again. We have
>tested the failover process with queries actively running
>(they fail). We are always able to reconnect and resume
>normal processing after the backup node recovers the SQL
>server.
>The linked server failures don't appear to have any real
>pattern to them. There seems to be a weak correlation
>between a failover and failure in the linked servers (the
>linked servers fail 1 - 2 days later).
>This is not making any sense to me at all. I am NOT a fan
>of linked servers, but I have no choice here: I inherited
>these and the developers are NOT interested in
alternative
>solutions.
>If you have any thoughts on the matter, please drop a
line.
>Regards,
>hmscott
>Additonal info:
>Windows 2000 SP4
>SQL 2000 SP3 (hotfix 0818)
>MDAC 2.7 SP1
>OpenLink MultiTier 5.1
>.
>

servers and performance

Hi,
I have a client that he needs to configure a linked server
on a server cluster with SQL Server 2000, windows 2000,
two instances: one default and one named instance.
Linked Server should be configured in the named instance
calling a database from default instance
There is any problem about performance using linked server
in that condition?
Thank's for information
I was searching in Microsoft pages and I didn't find
information over that topicsThere are no performance issues specific to that configuration. There is
the general consideration that remote queries use more resources and
encounter greater latency than local queries, so if a high percentage of
requests involve both servers then you could experience poor performance.
There is no specific guidance on when you would see a problem, but absent
real data I always use 80/20 as a rule of thumb. That is, 80% of the
requests should be completely satisfied locally and no more than 20% should
require access to the linked server. I use 90/10 when I need to make a more
conservative estimate.
--
Hal Berenson, SQL Server MVP
True Mountain Group LLC
"ruth G" <caubd@.isa.com.co> wrote in message
news:007301c36801$f96d1f00$a401280a@.phx.gbl...
> Hi,
> I have a client that he needs to configure a linked server
> on a server cluster with SQL Server 2000, windows 2000,
> two instances: one default and one named instance.
> Linked Server should be configured in the named instance
> calling a database from default instance
> There is any problem about performance using linked server
> in that condition?
> Thank's for information
> I was searching in Microsoft pages and I didn't find
> information over that topicssql

Monday, March 19, 2012

servers and Cluster

I am having an issue using linked servers on
active/active cluster. I have two instances, and when
both instances are on the same machine, things work as
expected. When I move one of the instances to the other
machine, it does not. It appears to work correctly when I
link the named instance to the default instance. I am
having issues linking the default instance to the named
instance.
What is the text of the query you are issuing? What error is returned from
the Linked Server query? What are the SQL Server and operating system
versions?
Regards,
Farooq Mahmud [MS SQL Support]
This posting is provided "AS IS" with no warranties, and confers no rights.
Are you secure? For information about the Strategic Technology Protection
Program and to order your FREE Security Tool Kit, please visit
http://www.microsoft.com/security.